Demolition and renovation of an existing suite on the seventh floor. The new layout consisted of a reception area, waiting area, consultation room, style and colour rooms, a private office and a break room. The scope included architectural modifications such as custom millwork and stainless steel cabinets, and alterations to the mechanical and electrical building services. The existing building façade glazing was modified to install two new metal make-up air intake louvres.

previous arrowprevious arrow
next arrownext arrow
previous arrownext arrow
Slider