Renovation of areas within a long term care facility which included a state-of-the-art commercial kitchen, new cold storage rooms, a server and dining rooms. The project was phased to accommodate the requirements of the occupied facility whilst the production and eating areas were reconfigured. New underground services, concrete slab reinstatement, mould abatement under negative pressure, and structural reinforcement were all required as part of the scope of works. Infection prevention measures were also required during the project.

P216049 - VeraDavisLTC_1_Servery1
P216049 - VeraDavisLTC_2_Servery9
P216049 - VeraDavisLTC_3_0352
P216049 - VeraDavisLTC_4_0330
P216049 - VeraDavisLTC_5_0336
P216049 - VeraDavisLTC_6_0333
P216049 - VeraDavisLTC_7_0325
previous arrowprevious arrow
next arrownext arrow
P216049 - VeraDavisLTC_1_Servery1
P216049 - VeraDavisLTC_2_Servery9
P216049 - VeraDavisLTC_3_0352
P216049 - VeraDavisLTC_4_0330
P216049 - VeraDavisLTC_5_0336
P216049 - VeraDavisLTC_6_0333
P216049 - VeraDavisLTC_7_0325
previous arrow
next arrow