Phased renovation of the existing, fully-functioning pharmacy, to create a new Closed-Loop Pharmacy to accommodate two dispensing robots. Work was completed on the 18th floor, with active clinical space adjacent, above and below the site. Work included the creation of the following rooms: Student Workroom, Pharmacist workroom, CIVA staging area, Clinical Trials area, Nicu Oral Dose area, Floorstock replenishment, Drug distribution room, Receiving Room, Negative pressure room, Barcoding room, Non-sterile compounding room, Staff changeroom and offices.

Full hoarding and sealing was provided through the AIRE Guardian Shield system which meets ICRA Class 4 Level, and is compliant with CSA. In addition, independently sealed 6mm poly was installed to ease cleaning after each construction phase.