UHN Michener Institute Health Care Education Lab Ph2
Phased demolition and renovation of the occupied 12th floor to create multi-purpose simulation laboratories for students and prospective surgeons. The learning area included the creation of three lead-lined independent simulation rooms, and one large multi-user simulation space, complete with two anterooms. The whole suite is pressurized to 0.12 in-wg, with the anterooms pressurized to 0.15 in-wg. IPAC was provided during construction.
CLIENT
The Michener Institute of Education
CONSULTANT
Diamond Schmitt Architects Inc.
BUDGET
$7.9 million
CONTRACT TYPE
Stipulated Lump Sum
SIZE
5,100 sf
LOCATION
Toronto, ON