The project required major security upgrades whilst retaining the ‘Modern-Classical’ heritage components within the facility. Renovations were scheduled to allow continuous use of the facility during construction, with all construction after hours.

The main entrance, and two jury entrances were altered, and a new dedicated staff entrance was constructed. Other security upgrades included video surveillance, duress alarms, and intercom systems.

 

23 12 07 John St. JURY resize
processed-9297F93A-2FDE-4A18-9540-7252135DE44E JURY JOHN resize
processed-35E84041-F9B3-440A-B357-9CAB6B144E95 JURY KING ST resize
23 12 13 Front Entrance processed-294D5FD9-2585-4958-BA84-17FD0071FBF2 resize
23 05 25 Image 7 rev STAFF
previous arrowprevious arrow
next arrownext arrow
23 12 07 John St. JURY resize
processed-9297F93A-2FDE-4A18-9540-7252135DE44E JURY JOHN resize
processed-35E84041-F9B3-440A-B357-9CAB6B144E95 JURY KING ST resize
23 12 13 Front Entrance processed-294D5FD9-2585-4958-BA84-17FD0071FBF2 resize
23 05 25 Image 7 rev STAFF
previous arrow
next arrow