Demolition of the existing showers, and installation of a new plunge tank within a fully operational shower room. The scope included careful removal of the existing wall, floor, and ceiling tile, construction of the tub surround, modification to plumbing, new tile to match existing, and water jetting of the marble for insertion of the club logo.